Uline H-953 Guia De Inicio Rapido página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7.
Remove leg set and included hardware from box.
(See Figure 7)
Figure 7
8. Hold one leg up to the bottom of tunnel. Make sure
the leg panel is facing outward and along the width
of tunnel. (See Figure 8)
Figure 8
PAGE 2 OF 12
INSTALLING LEG KIT USING FORKLIFT CONTINUED
Leg
9. Secure leg to tunnel
with six bolts, three in
each corner.
(See Figure 9)
10. Repeat step 8 and 9 with the other leg.
11. Lower forklift till shrink tunnel is resting on the ground.
Remove forks from unit.
12. Finished unit with legs. (See Figure 10)
Figure 10
Figure 9
0521 IH-953

Publicidad

Tabla de contenido
loading

Tabla de contenido