Kohler K-819-F63-0 Instrucciones De Instalación página 5

Ocultar thumbs Ver también para K-819-F63-0:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Bracket
Overflow
Cap
Pin
4. Install the Overflow Cap
NOTICE: The overflow cap should not touch the floor when installed. Do not force the overflow cap if it
does not slide easily to fit in place under the rim of the bath. If it does not fit, adjust the height of the
brackets.
Ensure the bath is positioned properly in the installation area. The bath drain should align with the
floor drain.
Position the overflow cap over the overflow pipe by inserting the pins into the slots near the bottom
of the bath.
Position the brackets at the top of the overflow cap over the pegs on the underside of the bath rim.
Secure the overflow cap using the brackets and screws provided.
Kohler Co.
Slot
5
Screw
1432010-2-A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-819-f62-0

Tabla de contenido