Screw in and tighten the long fastening
►
screws into the upper sleeves.
►
Screw in and tighten the short fastening
screws into the lower sleeves.
If appropriate, install any accessories in-
►
cluded in the scope of delivery, such as a
towel rod, (see separate instructions).
Mount the upper fastenings (see Fig. 6–9)
Mark the drill holes (see Fig. A).
►
Drill the holes and insert the anchors.
►
At the wall adapters screw out the securing
►
screws and pull out the retainers.
Screw on the wall adapters with hexagon
►
socket screws. Take the position of the drill
hole into account.
►
Insert the retainers into the wall adapters.
Take the position of the openings into ac-
count.
Only screw on the retainers handtight with
►
the securing screws. This allows the retain-
ers to still be moved for alignment.
Pre-install the lower spacers (see Fig. 10–11)
Use a knife to cut the two snap-in bolts
►
at the second marking to the dimension
49 mm.
Install both spacers on the radiator.
►
Suspend and align the radiator (see Fig. 12–
15)
Suspend the radiator via the screws into
►
the retainers. Ensure that the radiator does
latch in.
In order to align the radiator sideways:
►
Slide the retainers.
In order to set the wall clearance: Pull out
►
or push in the retainers.
In order to set the height: Turn the adjust-
►
ing screw at the retainer.
Install the lower spacers and fasten the radia-
tor (see Fig. 16–27)
Turn out the lower spacers until these are
►
positioned flat at the wall and the radiator
hangs straight.
Tighten the upper securing screws.
►
Mark the lower drill holes for the spacers.
►
Press the locking clamp to the rear and
►
hang out the radiator. Put down the radia-
tor with installed heating element so that
the cable is not bent or damaged.
Drill the holes and insert the anchors at the
►
lower markings.
►
Dismantle both spacers.
6
Screw both snap-in bolts tight.
►
Suspend the radiator via the screws into
►
the retainers. Ensure that the radiator does
latch in.
Press on both cover caps and slide them to
►
the rear.
Press the wall support clips onto both spacers.
►
Cover the radiator completely with the pro-
►
tective packaging.
Electrical connection
Have the following activities carried out by
►
an electrician (in accordance with the sepa-
rate instructions):
–
Connection of the electrical unit
–
Connection of the heating element to
the electrical unit
Commissioning
►
Remove the protective packaging com-
pletely before final cleaning or commis-
sioning.