3. Base Unit Assembly:
a. Insert base unit into hole and push down until screws in
temporary cover contact concrete floor.
CAUTION:
• Poke-Through cannot be rotated after inserting
into hole. Verify receptacles and communication
outlets are in desired orientation before insertion
into hole. (Temporary cover may need to be
removed to see device layout). Replace temporary
cover before installing base unit into floor. Keep
temporary cover in place until step 4.
Temporary cover screw
Important:
• If flexible conduit is used, electrical connections may be
made before inserting base unit into hole.
See note B in step 5.
a.
Temporary Cover Screws
touch concrete floor
Temporary cover
(Not for abandonment use)
Temporary Cover
3/4" off concrete floor
Carpet,
Wood, Tile
or Linoleum floor
Top of
concrete floor
4. Cover Assembly:
Install FPT4 series cover using instruction provided with cover.
a. Remove temporary cover.
b. Install cover per instructions provided with cover.
c. Close cover and step on cover to fully set to floor.
a.
5. Electrical connections:
• Remove two screws and remove cover from junction box.
• Attach conduit and provide wiring connections as required
by national and local electrical codes. See Step 6 for wiring
diagram. Note: Locking receptacles have only one circuit.
Make wiring
connections
per wiring
diagram,
see step 6
Note B:
If Flexible Conduit is attached to
bottom of junction box, Poke-through
electrical connections may be
completed before Poke-through is
installed in hole.
3 of 12 (English)
b.
c.
Note A:
Factory supplied junction box,
27 cu. in.