1N~ 50 Hz
220-240 V
a
Interconnection cable
b
Power supply cable
c
Fuse
d
Earth leakage circuit breaker
L N PWR
1
2 3
L
N
3×
12 3
a
Wire clamp
3 Reattach the switch box cover.
4 Optional: Attach the wire clamp (accessory) to the screw of the
refrigerant piping cover, and fix the cables to it with a cable tie.
5 Connect an earth leakage circuit breaker and fuse to the power
supply line.
ERGA04DAV37
Daikin Altherma 3 R
4P618926-1 – 2020.03
d
c
b
a
a
1×
1×
5 Starting up the outdoor unit
4.7
Finishing the outdoor unit
installation
4.7.1
To finish the outdoor unit installation
1 Insulate and fix the refrigerant piping and cables as follows:
d
c
a
e
b
f
g
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Field wiring (if applicable)
e
Liquid pipe
f
Liquid pipe insulation
g
Finishing tape
2 Install the service cover.
5
Starting up the outdoor unit
See the indoor unit installation manual for configuration and
commissioning of the system.
Installation manual
11