Airzone RADIANT Guía De Instalación Rápida página 19

Ocultar thumbs Ver también para RADIANT:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
For installations with up to 6 zones (without AZX6CCP)
Connect the O7 relay of the Control Module of Radiant Elements (AZRA6OUTPUT8Z) to the system of heating production
and the O8 relay to system of refrigeration production.
Connect the expansion bus between the Control Module of Radiant Elements (AZRA6OUTPUT8Z) and the RadianT main
control board. Use (2x0,5 + 2x0,22 mm
For installations with up to 8 zones (with AZX6CCP)
Connect the electrovalves to the relay outputs (O7 and O8) of the Control Module of Radiant Elements (AZRA6OUTPUT8Z).
Connect the Production Control Board (AZX6CCP) to the automation bus terminal of the RadianT main control board.
Remember to configure the CCP microswitch correctly. Use (2x0,22 mm
Connect the Airzone connection bus between the RadianT main control board and the thermostats. Use (2x0,5 + 2x0,22
mm
2
Airzone wire. In wireless elements, please check that the battery is inserted.
Note: To connect more than 4 Blueface, it is necessary an external power supply (AZX6POWER). These values can be altered
depending on the separation distance among them.
Power supply the Control Module of Radiant Elements (AZRA6OUTPUT8Z) and all the elements which need external power
supply. Use (3x1,5 mm
2
) wire.
Note: For the proper functioning of this main control board, all installation main control boards must be addressed and associated
(See Advanced settings section).
For installations with up to 6 zones (without AZX6CCP)
) Airzone wire.
2
2
) Airzone wire.
ES
EN
FR
IT
PT
DE
19

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Azx6ccpZx6ccp

Tabla de contenido