H-196, H-201
PEANUT DISPENSERS
60 AND 80 CUBIC FEET
TOOLS NEEDED
Flat Head Screwdriver
RECOMMENDED HARDWARE (NOT INCLUDED)
Hook x 2
PART
Capacity
Canvas Bag
Chain and Rope
Flex Tubing
Steel Rod
Valve Assembly
NOTE: Read instructions thoroughly. Remove
all components from box and locate all parts.
Remove pulley and U-bolt from rope.
INSTALLING PULLEYS
1. Attach pulleys to ceiling using hook or other secure
method.
2. Make sure one pulley is positioned directly above
the center of dispenser and the other clears the side
of bag so rope will not interfere when raising and
lowering of bag. (See Figure 1)
3. Ensure rope tie-off method is in place (cleat, anchor,
post, etc.). (See Figure 1)
INSTALLING VALVE ASSEMBLY
1.
Slide clamp ring over open side of tubing. (See Figure 2)
2. Insert valve assembly into bottom of flex tubing.
Ensure tubing covers entire flange. (See Figure 2)
3. Turn yellow handles to desired position.
4. Slide clamp ring down around tubing, covering flange,
and tighten screw with flat head screwdriver.
(See Figure 2)
PAGE 1 OF 6
1-800-295-5510
uline.com
Pliers
Cleat x 1
QTY
H-196
H-201
-----------
60 CU. FT.
80 CU. FT.
1
✓
1
✓
1
✓
2
✓
1
✓
INSTRUCTIONS
PARTS
PART
PVC Pipe
Clamp Ring
✓
Eyebolt
✓
U-Bolt
✓
Pulley
✓
✓
Figure 1
Figure 2
Para Español, vea páginas 3-4.
Pour le français, consulter les pages 5-6.
QTY
H-196
4
✓
1
✓
4
✓
1
✓
2
✓
Pulley
Pulley
Cleat
H-201
✓
✓
✓
✓
✓
0521 IH-196