Brita PURITY C Manual De Instrucciones página 18

Ocultar thumbs Ver también para PURITY C:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50
Filter cartridge
PURITY C25 Quell ST
PURITY C50 Quell ST
PURITY C150 Quell ST
PURITY C300 Quell ST
PURITY C500 Quell ST
PURITY C1000 AC
The fi lter system must not be opened or dismantled during operation. The fi lter cartridge must
not be opened.
The fi lter system fi lter head is designed for a service life of 10 years from the installation date.
It must be replaced after 10 years.
Production date
Production code – fi lter head – example: H 8252 11882
8
Production year, here: 2008
25
Production week, here: calendar week 25
2
Production day from Monday (1) to Friday (5); here: Tuesday
11882
Serial identifi cation number
Production code – fi lter cartridge – example: B8252080010
8
Production year, here: 2008
25
Production week, here: calendar week 25
2
Production day from Monday (1) to Friday (5); here: Tuesday
08
Number of the mix variant, here: No. 8
0010
Consecutive number of the fi lter cartridge, here the tenth cartridge; reset every day
3.5 Technical Safety Assembly Instructions
The terminal device operated with the fi lter must be free of limescale prior to installation.
Protect the fi lter system from sunlight and mechanical damage. Do not assemble near sources
of heat and open fl ames.
A stop valve must be installed before the fi lter system inlet hose.
If the water pressure is greater than 8.6 bar, a pressure reducer must be installed in front of the
fi lter system.
No copper pipes and no galvanised or nickel-plated pipes/connectors may be installed between
the water fi lter and consumer. The use of BRITA hose sets is recommended here. When choos-
ing the material for parts that come into contact with water after the BRITA fi lter system it must
be remembered that, due to the process, the decarbonised water contains free carbon dioxide.
Note: The water is not decarbonised when using PURITY C AC fi lter cartridges.
All parts must be installed in accordance with the country-specifi c guidelines on the installation
of drinking water facilities (in Germany, for example, connection to the mains requires a DVGW-
approved non-return valve in accordance with DIN EN 13959 or higher quality protection against
return fl ows).
When installing and operating the fi lter system, the Employers' Liability Insurance Associa-
tion regulations governing "Working in Commercial Kitchens" as stipulated by the Testing and
Certifi cation Body of the Expert Committee for the Food Processing Industry of the BG Central
Offi ce for Health and Safety at Work (BGR111) must be observed.
4 Installation
Caution: Prior to installation, read the technical data (Chapter 9) and the operating and safety
!
information (Chapter 3). After storage and transport below 0 °C, the product must be stored in the
open original packaging for at least 24 hours before it is commissioned at the stated ambient tem-
peratures (Chapter 9) for operation.
16
Flushing volume X
after 2–3 days stagnation
1.4 litres
2 litres
3 litres
6 litres
10 litres
1 litre
Flushing volume Y
after 4 weeks stagnation
14 litres
20 litres
30 litres
60 litres
100 litres
10 litres

Publicidad

Tabla de contenido
loading

Tabla de contenido