Descargar Imprimir esta página

Bradley On-Site S19-899 Manual De Instalación página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

S19-899
Installation
Fill and mount tank
1. Pour clean, potable water into the tank;
continue pouring until the tank is 1/3 to 1/2
full.
2. Pour the entire contents of the water
preservative bottle into the eye wash tank.
3. Add clean, potable water to the tank until the
water level reaches the top of the tank.
4. Insert one liner into the cap with hole and
attach the cap to the top of the eye wash
tank (make sure the cap is tightly closed)
(see Figure 1).
• S19-881 ONLY: Insert the tube into the
pinch to prevent leaking when installing
the tank.
NOTE FOR TANK INSTALLATION: To ensure
proper installation, the tank should be placed on
the pedestal from the front of the unit.
5. Invert the tank and place it on top of the
pedestal as shown in Figure 2a. The pierce
on the pedestal will puncture a hole in the
tank cap liner and allow the solution to flow.
• S19-881 ONLY: Make sure that the
locking tabs are in front of the pedestal
(see Figure 1). Raise the arm to snap fit in
an upright position (this will automatically
release the pinch).
• S19-921 ONLY: Raise the arm to snap fit
in an upright position, then secure the tank
to the pedestal using the side tank clamps.
Make sure the latches are pulled down
tight to the pedestal (see Figure 2b).
NOTE: After the tank is mounted to the pedestal,
minor spillage could occur. Allow the fluid to
stabilize completely before inspecting the unit for
leaks.
2
7/11/06
Figure 1
Figure 2a
Figure 2b
Bradley Corporation • 215-1272 Rev. E; EN 06-527
Installation
Turn cap to close
LOCKING
TAB
(S19-881
ONLY)
CLAMP
LATCH

Publicidad

loading