Install The Handles; Complete The Installation - Kohler Lyntier K-T10339-4 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Valve Stem

4. Install the Handles

Close the valves (hot = clockwise, cold = counterclockwise).
Position the spline adapter onto the valve stem.
Secure the spline adapter with the screw (supplied).
Place the gasket over the valve body and flush against the deck.
Thread the handle assembly onto the valve body.
Properly align the handle assembly.
Repeat this procedure for the remaining handle assembly.

5. Complete the Installation

Ensure that both faucet handles are turned off (hot = clockwise,
cold = counterclockwise).
Turn on the main water supply and check for leaks.
Turn on the hot and cold valves and run water through the spout
to remove debris. Check for leaks.
Turn off the hot and cold valves.
1057840-2-A
Gasket
Handle
Screw
Assembly
Spline Adapter
Valve Body
6
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido