(3) Test Run
[Test run screen]
(a) Read the section about Test run in the indoor unit Installation Manual before performing a test run.
(b) During the test run, indoor units will be forced to operate in the Thermo-ON status.
Except the set temperature, normal operation functions are accessible during test run.
(c) By selecting the address of another indoor unit, the liquid pipe temperature of the selected unit can
be monitored.
(d) The test run will automatically end in two hours.
* When AHC is controlled from the controller
To monitor the operating status of AHC, touch the [<] button on the [Test run] screen and access
the [General equipment] screen.
To set the humidity setting for the humidifier (when one is connected to the AHC), touch the [>]
button on the [Indoor unit setting] screen.
[Indoor unit setting screen]
– 21 –