Uline SHRINKFAST 998 EXTENSION Manual Del Usuario
Uline SHRINKFAST 998 EXTENSION Manual Del Usuario

Uline SHRINKFAST 998 EXTENSION Manual Del Usuario

Ocultar thumbs Ver también para SHRINKFAST 998 EXTENSION:

Publicidad

Idiomas disponibles

Idiomas disponibles

H-1302, H-1303
SHRINKFAST 998
EXTENSION
1.
Remove combustor
assembly from the H-950
heat gun by depressing
the #31 button and
using a twisting motion
to remove the combustor.
(See Figure 1)
2. Assemble the combustor
on the end of the
extension and confirm it
is locked in place by the
#31 button.
(See Figure 2)
1.
When operating the extension, the front trigger
needs to be depressed slightly to allow the gas
mixture to feed through the tube to the combustor
before igniting the unit. Normally three to five
seconds will be sufficient for this feeding procedure.
NOTE: It is sometimes beneficial to point the
end of the extension down during the feeding
cycle to allow the gas mixture to collect in the
combustion area.
2. Operation at this point can proceed as normal.
PAGE 1 OF 6
1-800-295-5510
uline.com
ASSEMBLY
Figure 1
Figure 2
OPERATION
3. Assemble the remainder
of the tool into the open
end of the extension
tube. Again, confirm it
is locked in place by
having the #31 button
protruding from the
extension tube.
(See Figure 3)
4. If any of the O-rings are damaged, replace them
before using the tool.
3. Upon completion and normal shut down, the tool
needs to be allowed a five second time frame to
vent the gases in the tube. Care should be taken, as
always, to assure the heated end of the H-950 gun
is properly placed in a non-combustible and safe
place.
4. When shrinking film on boats or any other fuel driven
vehicles, all fuel vents must be covered while the
shrinking process is being done. Uncover when
complete.
Para Español, vea páginas 3-4.
Pour le français, consulter les pages 5-6.
Figure 3
0521 IH-1302

Publicidad

Tabla de contenido
loading

Resumen de contenidos para Uline SHRINKFAST 998 EXTENSION

  • Página 1 Para Español, vea páginas 3-4. Pour le français, consulter les pages 5-6. H-1302, H-1303 1-800-295-5510 uline.com SHRINKFAST 998 EXTENSION ASSEMBLY Remove combustor 3. Assemble the remainder Figure 1 assembly from the H-950 of the tool into the open heat gun by depressing...
  • Página 2: Parts Diagram

    4-40 x 3/4", S/S Contact Screw 10-32 x 3/8" Screw Set 6-32 Hex Cap Nut Brass Resistor 4-40 S/S Nut Screen Screen Retaining Washer Contact Assembly Plastic, 3 Pointer Spacer 6-32 Hex Nut 1-800-295-5510 uline.com PAGE 2 OF 6 0521 IH-1302...
  • Página 3: Extensión Para Shrinkfast 998

    H-1302, H-1303 800-295-5510 uline.mx EXTENSIÓN PARA SHRINKFAST 998 ENSAMBLE Quite el ensamble 3. Ensamble el resto de Diagrama 1 de la cámara de la herramienta en el combustión de la pistola extremo abierto del tubo de aire caliente H-950 de extensión. Confirme presionando el botón...
  • Página 4: Diagrama De Partes

    Tornillo de Ajuste de 10-32 x 3/8" Tuerca de Tapón Hexagonal de Latón de 6-32 Resistor Tuerca S/S de 4-40 Pantalla Rondana de Retención de Pantalla Ensamble de Contacto Separador de 3 Puntas, Plástico Tuerca Hexagonal de 6-32 800-295-5510 uline.mx PAGE 4 OF 6 0521 IH-1302...
  • Página 5 H-1302, H-1303 1-800-295-5510 uline.ca RALLONGE POUR PISTOLET THERMIQUE SHRINKFAST Nº 998 MONTAGE 1. Appuyez sur le bouton 3. Raccordez l'autre partie Figure 1 n° 31 tout en tournant du pistolet thermique à l'ensemble de la l'extrémité ouverte du chambre de combustion tube rallonge.
  • Página 6: Schéma Des Pièces

    Vis de réglage 10-32 de 3/8 po Écrou borgne hexagonal 6-32 en laiton Résistance Écrou 4-40 en acier inoxydable Pare-feu Rondelle de retenue du pare-feu Ensemble de contact Cale d'espacement en plastique pour tube Écrou hexagonal 6-32 1-800-295-5510 uline.ca PAGE 6 OF 6 0521 IH-1302...

Este manual también es adecuado para:

H-1302H-1303

Tabla de contenido