Attaching Connection Cable - SICK SLT Instrucciones De Operación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 111
7
ELECTRICAL INSTALLATION
7.1

Attaching connection cable

10
1.
Rotate the main body (1) in the counterclockwise direction to unlock it. Note the
position markings while doing so (2 Locked; 3 Unlocked). You can now remove
the main body from the base (4).
2.
Now connect the connecting cable (2) to the M12 port (1) on the main body. (3
min. internal diameter)
Ø 17
(0.67)
3.
Locate the main body in the base bracket again and rotate the main body in
the clockwise direction to secure the signal lamp. Pay attention to the position
markers while doing so. (1 Unlocked; 2 Locked)
1
4
1
2
3
1
2
3
2
8026183 / 2021-04-29 | SICK
Subject to change without notice

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido