Pickup Bed Installation
1.
Install pickup bed
•
Ensure the locating bolts shown in figure 7 are properly installed to both the pickup frame and pickup
bed to prevent misalignment.
2.
Tighten the eight bolts to 129 ft-lbs (175 Nm).
FIGURE 7
3.
Install the fuel filler pipe and tighten to 44 in-lb (5 Nm).
4.
If equipped, install the urea filler pipe and tighten to 22 in-lb (2.5 Nm).
5.
Reconnect the LH and RH wire harnesses.
6.
Install the tailgate onto the pickup bed.
7.
While inside the pickup bed, inspect the fifth wheel hitch for proper puck placement.
•
Puck grooves should sit above the drilled holes.
•
There should be a minimum 0.039" (1mm) clearance between the pucks and holes in the pick up bed.
FIGURE 8
8.
Clean any debris from pickup bed
9.
Check the vehicle exterior lighting for proper operation.
©
2019,2020 Horizon Global
Page 6 of 24
Printed In Mexico
30180N
04/30/20
Rev. B