Descargar Imprimir esta página

Items Required For Installation - Dell PowerConnect B FCX Serie Guía De Introducción

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 196
Power supply unit operation
When only one PSU is installed, both "AC OK" and "DC OK" LEDs on the installed PSU must be green for the B-FCX
device to function normally.
When two PSUs are installed, both "AC OK" and "DC OK" LEDs for one of the installed PSUs must be green for the
B-FCX device to function normally.

Items required for installation

This document describes how to set up the PowerConnect™ B series FCX devices and mount them into standard
19-inch equipment racks. This section describes items shipped with the PowerConnect B-FCX Series and items you
will need for installation.
Items shipped with units
The following items are shipped:
B-FCX device
115V AC power cable (for AC sourced devices)
B-FCX-S devices ship with a .5M CX-4 stacking cable
Straight-through EIA or TIA DB-9 serial cable (F/F)
Rack mount kit
Warranty card
Rubber feet
Getting Started Guide
Web pointer card for software images and user documentation (including this guide).
Items that you must provide
Assembled equipment rack
Standard #12-24 pan-head screws for mounting the chassis to equipment racks
#2 Phillips-head screwdriver
A large flat-blade screwdriver
An ESD wrist strap with a plug for connection to the ESD connector on the chassis
To manage the system, you need a management station, such as a PC running a terminal emulation application.
Connect the management station to the Console serial port on the switch.
Use the serial connection to perform basic configuration tasks, including assigning an IP address and network mask
to the system. This information is required to manage the system using B-FCX management interfaces or using the
CLI through Telnet.
PowerConnect B-Series FCX/FCXS Getting Started Guide
53-1002049-01
All manuals and user guides at all-guides.com
7

Publicidad

loading

Este manual también es adecuado para:

Fcxs serie