1.
Install the hose
connection (C) in the
lubricating pin (A).
2.
Insert the lubrication
pin (A) in the correct
position in the bore of
the drive head.
3.
Secure the lubrication
pin (A) with the lock
washer (B).
4.
Install the lubrication line.
Please note:
8.5.6
Install adapter Set AS 2/R-300, AS 2/R-700
Fig. 14:
Install adapter Set AS 2/R-300, AS 2/R-700
• Only use 2 equal lubricant pins (do not mix adapter sets).
Different lubricating pins cause unequal distribution through an uneven
fl ow resistance.
• The difference in length of the lubrication lines should be < 20 mm.
Different lubricating line lengths cause unequal lubrication distribution through an
uneven fl ow resistance.
• The lubrication line must always be placed lower than the lubricating pin,
otherwise the lubrication line runs empty (uncontrolled oil spillage, bubbles are
formed in the hoses)
• Fill the lubrication line before commissioning, e.g. by repeatedly pressing the
lubricating device (button in the PLC control) or using the special delivery PURGE
(see page 24), until lubrication comes out of the lubrication pin.
A
B
3 842 358 814/2018-12, MIT: LU 2, Bosch Rexroth AG
Assembly
C
35/54
358 814-05