Installation And Startup; Security System; Connection To The Co2 Bottle And The Electricity Network - Lacor Ice Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3. INSTALLATION AND STARTUP

3.1. Security system

1. Bottle shutoff valve
2. Threaded CO2 connection
3. Regulator
4. Metal hose
5. Safety cable
6. O-ring
7. Coupling nut
8. Petcock
3

3.2. Connection to the CO2 bottle and the electricity network

Before starting the connection, always be sure that the coupling nut (7) has an O-ring (6)
inside. If there is not one there, put one in.
Once this has been verified, connect the coupling nut (7) to the threaded CO2 connection
(2). Do not use a wrench to tighten the coupling nut (7); only tighten by hand. If the
attachment cannot be made correctly, do not continue the operational procedure, contact
the CO2 bottle supplier and use another one.
Connect the metal hose safety cable (5) to the bottle shutoff valve (1). Connect the LACOR
model network cable to the 220V electricity network.
Verify that the network cable is also connected to the LACOR equipment.
If the model has a power switch, press it; if it does not have one, it will turn on automatica-
lly when connected to the electricity network.
Verify that the petcock (8) is closed and next, open the bottle shutoff valve (1) by turning it to
the right.
24
4
6
7
VERY IMPORTANT
Always tighten by hand
8
and replace the O-ring
if it has the slightest
sign of deterioration
3
2
5
Image 3
1

Publicidad

Tabla de contenido
loading

Productos relacionados para Lacor Ice

Este manual también es adecuado para:

Advance

Tabla de contenido