Technical Data - Grohe Seabury 25 502 Guia De Inicio Rapido

Ocultar thumbs Ver también para Seabury 25 502:
Tabla de contenido

Publicidad

Application
Operation is possible in conjunction with:
- Pressurized storage heaters
- Thermally controlled instantaneous heaters
- Hydraulically controlled instantaneous heaters
Operation with low-pressure storage heaters
(displacement water heaters) is not possible.

Technical Data

• Max. flow
• Flow pressure
- min.
- recommended
- greater than 72.5 psi, fit with pressure reducing valves
• Max. operating pressure
• Test pressure
• Temperature
- max. (hot water inlet)
• Water connection
Notes
- Installation of backflow protection must comply with local
codes and regulations.
- An access panel must be provided for access to hose
connections.
- Major pressure differences between cold and hot water
supply should be avoided.
Installation
Layout dimensions to establish proper clearances, see
dimensional drawing on page 1.
For deviation to the suggested installation, observe minimum
clearance required for escutcheon sizes.
Flush piping system prior and after installation of faucet
thoroughly!
Side valves, see figs. [1] and [2].
• Valve with a groove on the top edge of the cartridge (A) and
in addition marked with
"COLD"
right (cold water) side.
• Valve without a groove on the top edge of the cartridge (A)
and in addition marked with
the left (hot water) side.
1. Screw the mounting set (B) to the bottom of the thread of the
side valve (C), see fig. [1].
Make sure that the rubber washer (B1) is on the top of the
fiber washer (B2).
2. Insert the side valve (C) through the basin hole from below.
3. Place the escutcheon O-ring (D1) on the basin and screw
down the nut (D) until it stops.
4. Screw the escutcheon (E) down to the cap (D).
5. Tighten the mounting set (B) from below to secure the valve.
6. Close the cartridges (clockwise for the hot side and counter-
clockwise for the cold side).
7. Attach the hoses (C1) and (C2) to side valve (C).
Mount handle (18 731) or lever (18 732), sold separately,
see fig. [1].
All manuals and user guides at all-guides.com
approx. 50 L/min or 13.2 gpm
7.25 psi
14.5 - 72.5 psi
145 psi
232 psi
176 °F
cold - Right hand
hot - Left hand
should be mounted on the
should be mounted on
"HOT"
English
Cross handle (F):
1. Screw the ring (I) into the escutcheon (E) until tight.
Hand tighten only!
2. Tighten with screw (J) and screw in cover cap (J1).
If the gap between the handle and the escutcheon is
excessive, back off the escutcheon (E) and the nut (D) to
minimize the gap.
Lever handle (G):
1. Slide ring (G2) on lever (G).
2. Push on lever (G) and tighten with set screw (G1).
3. Screw the ring (G2) into the cap (E) until tight.
Hand tighten only!
It is recommended that the lever (G) be installed so they point
away from the spout when in the off position.
Spout, see fig. [3].
1. Place the O-ring (K2) and the escutcheon (K1) on the basin.
2. Insert the spout (K) through the escutcheon (K1) and basin.
3. Secure the spout with the mounting set (L).
4. Install the diverter (M) to the spout, gently guiding the lift rod
assembly (N) up through the center of the spout (K).
5. Tighten the lift rod knob (O) to lift rod assembly (N).
6. Install elbows (P) onto the diverter (M).
7. Attach hoses (C2) to the elbows (P).
Handshower, see fig. [4].
1. Install the escutcheon (Q1) onto the guide (Q).
2. Install the guide (Q) through the mounting surface, insure
the escutcheon O-ring (R) is in place.
3. Secure with mounting set (S).
4. Insert shower hose (T) through guide (Q) from below.
5. Tighten the shower hose (T) to the handshower (U).
Connect faucet, see fig. [5].
Connect the side valves to the water supply. Insure the
supplied washers are used for all connections.
The cold water supply should be connected on the right, the
hot water supply on the left side .
Open cold and hot water supply and check connections
for leakage.
Maintenance
Inspect and clean all parts, replace as necessary and grease
with special grease.
Shut off cold and hot water supply.
I. Ceramic cartridge, see fig. [6].
1. Unscrew cover cap (J1) and screw out screw (J).
2. Pull off lever (G) or handle (F) and unscrew ring (I) or (G2).
3. Unscrew escutcheon (E).
4. Unscrew ceramic cartridge (A) using a 17mm wrench.
5. Change complete ceramic cartridge (A) or O-ring (A1).
Observe the different replacement part numbers of the
cartridges, see page 2.
II. Flow control, see page 2.
Unscrew and clean flow straightener (13 934).
Assemble in reverse order.
III. Check valve, see fig. [5].
1. Disconnect shower hose (T).
2. Remove check valve (W).
Assemble in reverse order.
Replacement parts, see page 2 ( * = special accessories).
Care
Instructions for care of this faucet will be found in the Limited
Warranty supplement.
4

Publicidad

Tabla de contenido
loading

Tabla de contenido