Descargar Imprimir esta página

AVS Electronics FOGGY 30 Manual De Instrucciones página 35

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation FOGGY 50
Verify that package has been
positioned in the correct direction
before opening the package.
Use the supplied drilling template for positioning the plate, both on the wall and on the ceiling. Mark the holes based
on the predefined type of installation (wall/ceiling or drop ceiling).
Use screw anchors that can withstand a weight of at least 75 Kg each. They must be
suitable for the characteristics of the wall or ceiling to which they are secured.
Installation must be executed by qualified personnel
Check that the pipes are inserted in the pre-set holes.
The hanging hooks are represented by two couples of
screws with blocking nuts.
The screws are factory mounted and
blocked against their respective nuts
using a special blocking glue.
The installer must carefully
check that these screws and
corresponding nuts are
perfectly blocked before
mounting the equipment
Once the Foggy has
been removed from the
packaging, remove the
4 M4x6 type fixing
screws and remove the
cover.
Hook the upper pivot and the lower pivot of the Foggy to the specific
plate guide by sliding it sideways.
1
Both when fixing to the wall and the ceiling, rotate the equipment on the
pivots in order to easily access the inside of the Foggy with the various cables.
2
- 35 -
Disconnect the cable of the Liquid
Sensor from the F. SENSOR in the ma-
nagement board.
Unhook the fastening clamp of the tank.
Remove the tank in order to avoid liquid
leakage during the installations phases.
E
N
G

Publicidad

loading

Este manual también es adecuado para:

Foggy 50