(Fig 9) Insert 8mm Double Bolt Plate through the
channel in the bottom of the Running Board
(2) 8mm Flat Washers
(2) 8mm Nylon Lock Nuts
(Fig 11) Running Board
attached to Mounting Bracket
Passenger/right side Installation Pictured
(2) 8mm Flat Washers
(2) 8mm Nylon Lock Nuts
Front
Page 4 of 4
SUMMIT RIDGE 2.0 RUNNING BOARDS
2019 1500 SILVERADO/SIERRA CREW CAB
Front
(Fig 10) Front of Running Board
attached to Mounting Bracket
10/17/18 (RA)