3-1-7 –– Safety guard rails assembly
1. From the ground, remove the temporary safety guard rails on rung no. 5, then:
2. Hook the guard rail onto rung n°11
3. Deploy the "guard rail lifting pole".
4. Using the pole, position the other end on the rung at the same level of the opposite ladder.
5. Push the guard rail to its final position, the guard rail must be horizontal.
6. Lock the anti-lift device.
106-A000035745 - ind.0 – 11/2021
70