MOUNTING THE COMPONENTS OPTIONAL
- Install the feeder tube connection (B supplied) on the tank body (on the side where the boiler will be located);
securing it with 4 M6 screws (Pic. 1).
- On the opposite side (in the symmetrical position) install the closing plate (C supplied) securing it will 4 M6
screws (Pic. 2).
- Position the feeder tube support (D supplied) and fasten it to the tank body using 2 M6 screws and nuts (Pic. 3).
- Insert the feeder tube (E) with the feed screw making sure the feed slot is positioned facing upwards (Pic. 4).
- Insert the feeder tube (F) facing the rear side of the boiler (Pic. 5) and fasten it to the support (D) using the
screws provided (Pic. 6).
- Remove the pre-cut lidon the back of the boiler (Pic. 7), unscrew the fastening screws of the closing flange lo-
cated under the pre-cut lid and replace it with a flexible pipe connection flange (H -Pic. 8).
- Connect the flexible tube (N-photos 10 and 11) to the conveyor tube (F - photos 5-10) and to the flexible tube
connection flange (H -photos 8 and 9), and secure it using the supplied cable ties.
Note: the flexible pipe (G) must be positioned so that it carries the pellets to the tank without causing bot-
tlenecks (Pic. 10); verify the unit's proper functionality during the initial loading operations, and use sili-
cone to seal any powder leaks that may be encountered.
B
Pic.
1
E
Pic. 4
Pic. 7
F
G
Pic. 10
C
Pic.
2
D
F
Pic. 5
G
H
Pic. 8
11
D
Pic. 3
D
Pic. 6
G
H
Pic. 9