Merik SECURITY + 511MM FS2 Manual Del Propietário página 14

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY STEP 4
For Sliding and Swinging Gates Only
Install the Chain/Cable
1. Pull the cable loop from the
carton and fasten it to the
trolley with a master link from
the hardware bag (Figure 1).
• Push pins of master link bar
through cable loop and hole
in front end of trolley.
• Push master link cap over
pins and past pin notches.
• Slide clip-on spring over cap and onto pin notches until
both pins are securely locked in place.
2. To prevent the trolley from jamming against the opener
during operation, position trolley 5 to 15 cm from the
stop hole as shown. Then dispense the chain around
the opener sprocket (Figure 1). Make sure the sprocket
teeth engage the chain.
• Proceed around to the pulley bracket and forward to
the threaded trolley shaft.
3. Use the second master link to connect the chain to the
flat end of the shaft (Figure 1). Check to make sure the
chain is not twisted.
Figure 1
Install Chain
and Cable
in this Direction
Sprocket
Leave Chain
& Cable
Inside Carton to
Prevent Kinking
Keep Chain
Taut When Dispensing
Mounting
Plate
To avoid possible SERIOUS INJURY to fingers from moving
opener:
• ALWAYS keep hand clear of sprocket while operating opener.
• Securely attach sprocket cover BEFORE operating.
Motor Unit
14

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido