Installation procedure
Thick cement plate
Lifting tools
Connection
kit
Less than 1m
See the Fig.1 & Fig.2 to install the lifting bolts and hoisting tools.
• Use the lifting bolts with the size of M8~M10
• Press insert for new settings. Press hole in anchor if set. Ensure that the anchor can sufficiently withstand the weight
of the connection kit before installation.
3. Installation of connection kit
Use parts and components specified for installing the installation components.
(1) Change the installation direction of electric box according to requirements following the steps below; (see Fig.1)
Remove the cover of the electrical appliance box; (2 screws)
Remove the electrical appliance box; (2 screws)
Remove the top plate; (4 screws)
Change the outgoing direction of wiring (electric valve coil) between the equipment and the electrical appliance box;
Rotate 180° to install the top plate;
Install the electrical appliance box;
Install the cover of the electrical appliance box.
Foundation bolt
Long nuts or turnbuckle
Lifting bolt
Less than 1m
Note: All the parts in the figure are purchased locally.
Fig.2
Electrical appliance removal
Fig.1
17