R
Provide Structural
Pivot
Ceiling Support
Jamb
Wall
Jamb
Side
Panel
Receptor
Curb
Center line
#8 x 1 1/2"
Flathead Screw
Receptor
Curb
Wall
Jamb
Deflector
A
1012414 2
Pivot
Jamb
Wall
Jamb
Wall
Jamb
Strike
Seal
Side
Door
Panel
Receptor
32 7/8"
(83.5cm)
Fig. #1
Base
Center hole
Fig. #2
Strike
Seal
Wall
Jamb
Fig. #3
End Cap
Fig. #4
Español, Página 5
Français, Page 9
All information in these instructions is based on the latest
product information available at the time of publication. Kohler
Co.
reserves
the
right
characteristics, packaging or availability at any time without
notice.
MATERIALS REQUIRED:
S #2 Phillips screwdriver
S Level
S Drill (1/8" and 5/16" drill bit)
S Hacksaw
S Tape measure
S Clear silicone sealant
S (2) 9/16" open end wrenches
S Center punch
S Razor knife
S Masking tape
S Glass cleaner
S Safety glasses and shoes
NOTE: REFER TO Fig. #1 TO DETERMINE WHICH SIDE THE
DOOR SHOULD PIVOT ON. THE PIVOT SHOULD
ALWAYS BE OPPOSITE THE SHOWER HEAD.
NOTE: STRUCTURAL CEILING SUPPORT MUST BE
PROVIDED FOR THE PIVOT JAMB AS SHOWN IN
Fig. #1.
1. Install shower receptor according to packed instructions.
Finished wall material should be installed at this time. The
finished walls must be plumb to within 1/8" (3mm) from the
receptor to the top of the wall jambs.
2. Refer to Fig. #2. Place a piece of masking tape along the center
of the receptor curb where the door will pivot. Measure and mark
a location 32-7/8" (83.5cm) from the wall along the center line.
Place the 90 base on the receptor curb so that the marked
location is centered in the center hole of the base and the line is
centered in the base slot.
3. Mark the screw hole locations with a pencil. Remove the base. Drill
clearance holes into the receptor with a 1/8" drill. Remove the tape
from the receptor. Mount the 90 base to the receptor as shown
in Fig. #2 using two #8 x 1-1/2" flathead screws.
4. Mount the bottom end caps to the wall jambs using two #6 x 3/4"
flathead screws. Refer to Fig. #3. Position wall jambs against the
wall and in line with the slots in the 90_ base. Mark screw locations
on the wall and drill holes using a 1/8" drill. Slide the strike seal into
the wall jamb on the door side of the receptor. If necessary trim the
strike seal so it is flush with the top of the wall jamb. Install wall
jambs using four #8 x 1-1/2" flathead screws. Assemble deflector
to wall jamb using a #8 x 1-1/2" flathead screw, as shown in
Fig. #4.
PROFILEt
SHOWER DOOR
36" (91.4cm)
K 9856
to
make changes in product