Install The Plumbing; Complete The Finished Wall; Complete Installation - Kohler Lakewood K-1649 Guia De Instalacion

Ocultar thumbs Ver también para Lakewood K-1649:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Install the Plumbing

CAUTION: Risk of property damage. Make sure a watertight seal exists on the bath drain.
Connect the drain to the trap according to the drain manufacturer's instructions.
NOTICE: An access panel will simplify future maintenance.
Install the faucet valving according to the faucet manufacturer's instructions. Do not install the faucet trim
until instructed. Open the hot and cold water supplies, and check the supply connections for leaks.
Run water into the bath, and check the drain connections for leaks.

5. Complete the Finished Wall

Apply a bead of silicone sealant to the nailing-in flange.
Cover the framing with water-resistant wall material with the paperbound edge a maximum of 1/4"
(6mm) above the bath deck. Seal the joints between the bath rim edge and the water-resistant wall
material with silicone sealant.
Apply tape and mud over the water-resistant wall material. Install the finished wall to the water-resistant
wall material. Seal the joints between the bath rim and the finished wall material with silicone sealant.

6. Complete Installation

Apply silicone sealant around the valves and outlets.
Install the faucet and drain trim according to the manufacturer's instructions.
1018083-2-A
4
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Lakewood k-1650

Tabla de contenido