AGA marvel ML15BC Serie Instrucciones De Instalación, Operación Y Mantenimiento página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 2: Remove the door gasket
With the door laying on a flat surface and starting at a
corner of the door remove the magnetic door gasket from
the interior side of the door, see Figure 15. Set the gasket
aside on a flat surface.
There are 10 holes in the gasket retainer extrusions, (3 on
each side and 2 at the top and bottom which are used to
fasten the panel to the front of the door. The screws are
provided in the literature pack along with the door lock,
which is provided on certain models.
Press and hold down this
tab on the wire connec-
tor and pull the connector
apart.
Figure 14
OVERLAY DOOR PANEL INSTALLATION
Holes in
gasket
retainer.
Figure 15a
Figure 15
Step 3: Cut and drill the overlay panel
Depending on your model cut the overlay door panel to the
dimensions shown in Figures 16 to 23. Also see Table "C"
for the height dimension and door styles. The window cut
out is for glass door models only. If your appliance has a
lock also drill the lock hole in the panel, see Figure 25.
15
Overlay panel
flush with top
of door.
Overlay panel to
be centered on
width of door.
Magnetic Gasket
remove starting at a
corner, grasp and pull
away from the door.

Publicidad

Tabla de contenido
loading

Tabla de contenido