Hydraulic Systems; Priming The Pump - Riello F10 Instrucciones Para La Instalación, Uso Y Mantenimiento

Ocultar thumbs Ver también para F10:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

HYDRAULIC SYSTEMS

Warning: before starting the burner make sure that the return pipe-line is not clogged: any obstruc-
tion would cause the pump seals to break.
WARNING
The pump is supplied for use with a two pipe system.
For use on a one pipe system, it is necessary to remove the by-pass
screw (A), (see figure).
D5219
H = Difference of level.
L = Max. length of the
suction line.
I.D.= Internal diameter of the
oil pipes.
D5220
A filter must be installed on the suction fuel line.
2396
H
meters
0.5
1
1.5
2

PRIMING THE PUMP

Loosen the plug of the vacuum gauge (5, fig. 1) and
wait until the fuel flows out.
L meters
H
I. D.
I.D.
meters
8 mm
10 mm
0
35
100
0.5
30
100
1
25
100
1.5
20
90
2
15
70
3
8
30
3.5
6
20
4
GB
L meters
I. D.
I.D.
8 mm
10 mm
10
20
20
40
40
80
60
100
The pump vacuum should not exceed a
maximum of 0.4 bar (30 cm Hg).
Beyond this limit gas is released from
the oil.
Oil lines must be completely airtight.
The return line should terminate in
the oil tank at the same level as the
suction line; in this case a non-return
valve is not required.
When the return line arrives over the
fuel level, a non-return valve must be
used.
This solution however is less safe than
previous one, due to the possibility of
leakage of the valve.
PRIMING THE PUMP
Start the burner and wait for the priming.
Should lock-out occur prior to the arrival
of the fuel, await at least 20 seconds
before repeating the operation.
A
D5199

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

3746260

Tabla de contenido