Canopy Housing Installation - Allen + Roth LP8075LBN Manual Del Usuario

Ocultar thumbs Ver también para LP8075LBN:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WIRING INSTRUCTIONS (Continued)
5. After connections have been made, turn leads
upward and carefully push leads into the outlet
box, with the white and green leads to one side
of the box and the black leads towards the other
side. The wires should be spread apart with the
grounded conductor and the equipment-
grounding conductor on one side of the outlet
box and the ungrounded conductor on the other
side of the outlet box. (Fig. 5)

CANOPY HOUSING INSTALLATION

1. Remove one of the two shoulder screws in the
hanger bracket (B) with Phillips screwdriver
(BB). Loosen the second shoulder screw
without fully removing it. Assemble ceiling
canopy (D) by rotating key slot over shoulder
screw in hanger bracket (B). Tighten shoulder
screw. Fully assemble and tighten second
shoulder screw that was previously removed.
(Fig. 1)
WARNING
To avoid possible fire or shock, make
sure that the electrical wires are
completely inside the canopy housing
and not pinched between the housing
and the ceiling.
Phillips
BB
Screwdriver
2. Securely attach and tighten the canopy
screw cover (E) over the shoulder screws in
the hanger bracket (B), utilizing the keyslot
twist-lock feature. (Fig. 2)
5
1
2
x 1
12
E
all
D
BB

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

0198677

Tabla de contenido