ASSEMBLY INSTRUCTIONS (Continued)
4. Route wires through motor coupling cover
(F), canopy screw cover (E) and ceiling
canopy (D). (Fig. 4)
5. Reinstall the hanger ball on the
downrod/hanger ball assembly (C) by routing
the three 54 in. wires through the hanger ball.
Position the pin from the downrod/hanger ball
assembly (C) through the two holes in the
downrod and align the hanger ball so the pin is
captured in the groove in the top of the hanger
ball. Pull the hanger ball up tight against the
pin. Securely tighten the set screw in the
hanger ball. (Fig. 5)
CAUTION
A loose set screw could result in a wobbly
fan.
6. Cut off excess lead wire approximately 6 to 9
in. above top of the top of the downrod/hanger
ball assembly (C). Strip insulation off 1/2 in.
from the end of each lead wire. (Fig. 6)
4
D
5
6
8
E
F
C
C