Vetus BOW3512D Manual De Manejo Y Instrucciones De Instalación página 13

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
• Now fit the intermediate flange permanently to the tail piece and
grease the threads of the bolts with 'outboard gear grease' before
inserting and tightening them.
Check for possible leaks immediately the ship returns to wa-
ter .
4 .3
Final assembly
• Check again dimension 'A' .
• Grease the propeller shaft with 'outboard gear grease' and install
the propeller.
The propeller should run a minimum of 1 .5 mm (
thrust tube wall, all round .
• Grease the input shaft with an installation compound, like 'Mo­
lykote® G­n plus' .
• Grease the threads of the fastenings bolts with 'outboard gear
grease' and install the electric motor to the intermediate flange.
• For a first check, turn the propeller by hand, it should turn easily,
whilst being connected to the output spindle of the electric mo­
tor.
vetus® Operation manual and installation instructions bow thruster BOW3512D
n
ote
1
/
") free of the
16
Outboard Gear
Grease
Outboard Gear
Grease
ENGLISH
M6
2.5
4 - 5 Nm
(3 - 3.7 ft.lbf )
A = B + 8 mm
A = B +
5
/
"
16
M6
10
2 Nm
(1.5 ft.lbf )
6
M8
12 - 15 Nm
(9 - 11 ft.lbf )
Outboard Gear
Grease
Molykote® G-n plus
13
020523.09

Publicidad

Tabla de contenido
loading

Tabla de contenido