EAS ELECTRIC E190WHF Manual De Instrucciones página 25

Acumulador aerotérmico acs
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

C. Installation instruction
Installation diagram:
Air Outlet
(Hot Water use )
(Water Supply )
Remark:
1. For the first time use, ensure the water tank have been filled with water before power on to prevent
burn out.
2. Follow with the water heater unit, there are some installation parts (see the annex detail list of parts).
As for other water system components, the user or installation company should provide by themselves.
3. Before installation, it's better to reserve a water supply pipe interface, hot water outlet pipe interface
and drainage pipe interface. Among them, the water supply pipe and hot water outlet pipe should be
used in line with standards for drinking water pipes. (E.g. PPR pipe or stainless steel pipe, etc.), can
4. If the using place below 0 ℃, make sure to insulate the water pipes to prevent frozen.
not use iron pipe or the rubber hose with odor for installation.
5. Air inlet /outlet can connect the vent tube, but pipe should not be too long and less crankle.
Vent Tube
Hot Water Outlet
Condensate water
drainage
Safety Valve
Heat Circulation
water inlet
Heat Circulation
water outlet
Filter
One-way Valve
Water Inlet
Ball Valve
(Fig.4)
Drainage Pipe
Three-port Valve
Drainage Pipe
5
Air Inlet
CLOCK
ON/OFF
TIMER
MODE
V.3

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido