mabe MMI12CABWCCE8 Manual De Instrucciones página 82

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

82
Be careful that matters, such as wastes of sands, etc. shall not enter
the pipe.
The standard pipe length is 4 m, if it is over 7 m, the function of the
unit will be affected. If the pipe has to be lengthened, the refriger-
ant should be charged according to 20 g/m. But the charge of refrig-
erant must be conducted by professional air conditioner engineer.
Before adding additional refrigerant, perform air purging from the
refrigerant pipes and indoor unit using a vacuum pump, then
charge additional refrigerant.
Outdoor Unit
Outdoor Unit
• Maximum elevation: (A) max = 10 m
• In case the elevation (A) is more than 5 m, oil trap should be in-
stalled every 5 to 7 m
• Maximum length: (B) max = 15 m
• In case the pipe length B is more than 7 m, the refrigerant should
be charged, according to 20 g/m.
B
Indoor Unit
A
Oil Trap
B
Indoor
Unit
A
Outdoor Unit
B
Indoor
A
Unit

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido