Broan ALLURE QS2 Series Instrucciones De Instalación página 3

Ocultar thumbs Ver también para ALLURE QS2 Series:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

®
ALLURE ® QS2 SERIES
IBRO ,N
° .o .ooo
Page 3
PREPARE THE HOOD
PREPARE THE HOOD
[_
Remove
Teflon_=coated
bottom cover
from hood.
Set cover and
mounting screws
aside.
Teflon"is a registered
trademark of DuPont.
El
Remove
Damper/Duct
Connector
from inside
the hood. Set
connector
aside - with
mounting
screws and
parts bag.
DAMPER/
DUCT
CONNECTOR
Remove either
top or back
wiring knock-
out and install
approved
Electrical
Cable Clamp.
TEFLONQCOATED
BOTTOM COVER
(Held in place with 2 screws)
ELECTRICAL
CABLE CLAMP
El
Remove Air
Chute - h_]d in
place with one
(1) screw.
NOTE: Be care-
ful not to discon-
nect any wires.
El
Remove Baffle
from air chute.
AIR CHUTE
\
BAFFLE
BAFFLE
\
Non-Ducted
installation
- Skip to Step 15.
The following
Steps (6 thru
14) are for
DUCTED
iNSTALLATiON
ONLY.
(3) #8 SCREWS
LIGHT
PANEL
El
Rotate baffle. Re-
insert baffle into air
chute (as shown) so
that baffle tabs fit all
the way into slots in
air chute. An audible
"click" will be heard
when fully installed.
This will close off
the air flow through
the non-ducted slots
on top of hood.
SLOTS
TABS
[_
Remove
Panel
held in
with
#8
Light
place
(3)
screws
and (2) #8 screws. Disconnect light assembly wire harness
(white connector).
El
Re-install air chute, re-connect wire
harness, and replace light panel.
NOTE: Be careful not to trap wires
between support
fin and light panel.
SUPPORT FIN

Publicidad

Tabla de contenido
loading

Tabla de contenido