Checking The Drainage - Friedrich M24CJ Manual De Instalación

Sistema split sin conductos
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CAUTION
!
According to the confirmation of the above con-
ditions, prepare the wiring as follows.
1
Never fail to have an individual power circuit
specifically for the air conditioner. As for the
method of wiring, be guided by the circuit
diagram posted on the inside of control
cover.
2
The screw which fasten the wiring in the
casing of electrical fittings are liable to
become loose from vibrations to which the
unit is subjected during the transportation.
Check them and make sure that They all
are tightly fastened. (If they are loose, it
could cause burn-out of the wires.)
3
Specification of power source.
4
Confirm that electrical capacity is sufficient.
5
See that the starting voltage is maintained
at more than 90 percent of the rated voltage
marked on the name plate.
6
Confirm that the cable thickness is as speci-
fied in the power source specification.
(Particularly note the relation between cable
length and thickness.
7
Always install an earth leakage circuit
breaker in a wet or moist area.
8
The following would be caused by voltage
drop.
- Vibration of a magnetic switch, which will
damage the contact point, fuse breaking,
disturbance of the normal function of the
overload.
9
The means for disconnection from a power
supply shall be incorporated in the fixed
wiring and have an air gap contact separa-
tion of at least 3mm in each active(phase)
conductors.

Checking the Drainage

To check the drainage.
1
Pour a glass of water on the evaporator.
2
Ensure the water flows through the drain
hose of the indoor unit without any leakage
and goes out the drain exit.
Drain Pan
Leakage
Checking
* The feature can be changed according to the
type of model.
19
Connecting area
drain hose
Leakage
checking
Drain
Hose

Publicidad

Tabla de contenido
loading

Tabla de contenido