Kohler Finial K-318 Guia De Instalacion página 4

Ocultar thumbs Ver también para Finial K-318:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Prepare the Site — Wall Plate(s)
Determine the desired mounting location.
Mark the vertical and horizontal center lines for the accessory to be
installed. Consult the roughing-in diagrams to determine the
dimensions.
When installing multiple-post accessories, provide the required
distance between the center points.
Use a level to ensure that all center points are level.
3. Mark and Drill the Pilot Holes
Mark the pilot hole locations vertically 9/16" (1.4cm) above and
below the center point or center points.
Vertically line up the holes on each wall plate. Make sure the larger
hole is on the bottom.
If the installation requires multiple posts, confirm that the
centerpoints are even using a level.
NOTE: There is no provision for later adjustment if the center points
and resulting pilot holes for multiple-post accessories are not level.
Select a drill and bit that are appropriate for the wall material you
will be drilling through.
Carefully drill a 5/16" hole at all marked pilot hole locations.
1020818-2-A
4
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido