INSTALLATION
Installation
Preparing the power cable
160
≥ 30
Fitting the wall mounting bracket
f Mark out the holes for drilling using the installation template.
f
If the appliance is to be installed with water connections on
finished walls, also mark out the fixing holes in the lower part
of the template.
f Drill the holes and secure the wall mounting bracket with
f
2 screws and 2 rawl plugs (screws and rawl plugs are not part
of the standard delivery).
f Fit the threaded stud provided.
f
f Fit the wall mounting bracket.
f
Fitting the cable grommet
f Fit the cable grommet. For connecting cables > 6 mm², en-
f
large the hole in the cable grommet.
8
| PEO 18/21/24 | PEO 27
Making the water connection
Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
f Seal and insert the twin connectors.
f
Material losses
!
Never use the shut-off valve in the cold water inlet to
reduce the flow rate.
Preparing the back panel
Material losses
!
If you break open the wrong knock-out in the back panel
by mistake, you must use a new back panel.
f Break out the relevant cable grommet knock-out in the back
f
panel. Deburr any sharp edges with a file if necessary.
www.stiebel-eltron.com