Commissioning; Commissioning The Complete System; Commissioning The Dgci - Festo DGCI Serie Manual De Instrucciones

Ocultar thumbs Ver también para DGCI Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 47
DGCI−...
6

Commissioning

Commissioning the complete system

Slowly pressurize the complete system.
S
In this way you will prevent sudden
uncontrolled movements.
For slow start−up pressurization, use
safety start−up valve HEL.

Commissioning the DGCI

Warning
Uncontrolled fast moving parts can cause
injury to people in the vicinity of the DGCI.
S Make sure that:
nobody can place his/her hand in the
path of the moveable mass (e.g. by
providing a protective grill)
there are no objects within the position
ing path.
It should not be possible to touch the
DGCI until the mass has come to a
complete stand.
Please note
Special commissioning regulations apply to the electronic control of the DGCI.
S Complete the commissioning as described in the manuals for the controller.
Festo DGCI−... 0801a English
Fig. 16
Fig. 17
35

Publicidad

Tabla de contenido
loading

Tabla de contenido