Brooks Instrument GT1306 Manual De Instalación Y Funcionamiento página 24

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 43
Section 4 Maintenance
Models GT1306 and GT1307
4-2
Anytime the meter is removed for service, new O-rings should be
installed in both the inlet and outlet end fittings.
Reassemble the flowmeter as follows:
a. Carefully install the float in the tube with the metering edge up. Refer to
Figure 3-1 to determine the metering edge location.
b. Carefully hold the tube, (with float installed), sleeve, and end fitting, and
push the tube on the top fitting.
c. Tighten the side plate screws in place.
d. Install the front and rear windows.
Pressure test the meter before returning it to service. Hydrostatic
pressure testing should be performed by qualified personnel or
serious injury and/or damage to the equipment can result.
Installation and Operation Manual
X-VA-1306-1307-eng
Part Number: 541B079AAG
NOTICE
WARNING
October, 2016

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gt1307

Tabla de contenido