Warning
Power cord is used as a disconnection device: To de-energize
equipment, disconnect the power cord.
6. Verify that the POWER LED is green. If the LED is OFF, refer to
"Troubleshooting" on page 33 for instructions.
Note
The switch perform a self-diagnostic test upon power up. This takes
about 20 seconds to complete.
7. Power ON the end-nodes connected to the switch.
8. Check that all the LINK/ACT LEDs are green. If any of the LEDs is
OFF, refer to "Troubleshooting" on page 33 for instructions.
The switch is now ready for use.
AT-FS708 Fast Ethernet Switch Installation Guide
5
27