SHUR-DRI SDTS5-01 Manual De Instalación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Process C. 1. Install a shallow well
pump (SDTS5-01, SDTS10-01)
DRAINING FOR SERVICING OR FOR WINTER
The pump should be drained before it is disconnected for
servicing or if it is in danger of freezing. To drain:
• Remove drain plug from bottom of pump case.
• Remove discharge tee to vent the pump.
• Drain all piping to a point 3 feet (1 meter) below
ground level.
For wells 25 feet or less in depth, the 1/2 HP SDTS5-01 and 1
HP SDTS10-01 pumps are recommended. However, the 1 HP
SD-100-01 and the 1/2 HP SD-520-01 convertible pumps may
be adapted to shallow wells with an ejector kit.
General Materials Required
• One can PVC cement (read instructions carefully)
• One can thread compound (read instructions carefully)
• One 1-1/4" foot valve
• Two male 1-1/4" PVC adapters
• Enough rigid 1-1/4" PVC pipe and couplings to reach from
bottom of well to pump
• One 4" well seal with vent plug
• One 1-1/4" PVC elbow
REMINDER: ALL JOINTS AND CONNECTIONS MUST BE AIRTIGHT. A SINGLE PINHOLE
LEAK WILL PREVENT THE PROPER OPERATION OF THE PUMP. USE THREAD
COMPOUND ON ALL THREADED CONNECTIONS UNLESS SPECIFIED OTHERWISE.
1. Thread 1-1/4" male PVC
adapter into foot valve. Hand
tighten, then tighten 1/4 turn
with crescent wrench.
2. Subtract four feet from the depth
of your well (see page 2 "Finding
the Depth of Your Well"). This is
the total length of rigid PVC pipe
and couplings to cement onto
the 1-1/4" male PVC adapter.
Cement one section of rigid PVC
pipe to the PVC adapter which is
connected to the foot valve, then
lower the whole assembly into the
well, foot valve first. Firmly clamp
the end of the rigid PVC pipe
with a pipe clamp to prevent the
assembly from sliding down into the well.
For parts or assistance, call Shur-Dri Customer Service at 1-800-535-4950
• One discharge tee
• One pressure gauge
• One male 1" PVC adapter
• Enough rigid 1" PVC pipe to reach from pump to pressure
tank to service line
• One female 1" PVC adapter
• One 1" tank cross (for diaphragm tanks)
• Two 1/4" plugs
• One 1/2" drain cock
• One 10" x 1" nipple
In addition to General Materials, for the SD-520-01
and SD-100-01 Convertible only
One ejector kit; includes ejector, venturi tube, gasket, bolts,
plug, tubing, and fittings.
Tools needed for all pump installations
Pipe wrench, pipe clamp, crescent wrench, slot screwdriver,
24-tooth hacksaw, knife or round file.
3. Cement as many couplings and
sections of rigid PVC pipe as it
1-1/4"
MALE PVC
takes to equal the depth of your
ADAPTER
well minus four feet, then firmly
clamp the assembly with a pipe
clamp to prevent the assembly
FOOT
from sliding down into the well.
VALVE
PVC
PIPE
SECTION
1-1/4"
MALE PVC
ADAPTER
FOOT
VALVE
4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sdts10-01Sd-520-01Sd-100-01

Tabla de contenido