WABCO TEBS E Manual Del Usuario página 17

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
Replacing the TEBS E modulator
– Use an open-end spanner (size 22) to remove the brake line (Ø 12 x 1.5), con-
nection 2.1, on the modulator.
– Use an open-end spanner (size 22) to remove the brake line (Ø 12 x 1.5), con-
nection 2.2, on the modulator.
– Use a suitable tool (size 19) to loosen the threaded connection of the modulator
on the valve mount.
– Now, carefully remove the modulator from the support and pack it in the foil and
the carton of the delivered replacement modulator.
en
TEBS E
15

Publicidad

Tabla de contenido
loading

Tabla de contenido