CEMO Z-40.12-227 Manual Del Usuario página 9

Colector de plástico reforzado con fibra de vidrio
Ocultar thumbs Ver también para Z-40.12-227:
Tabla de contenido

Publicidad

GRP Collecting Trough
Tank documents and technical information,
Approval No.: Z-40.12-227
1. Approval "OPERATOR EXCERPT"
2. Transport, installation and
operating instructions
3. Inspection declaration
Important documents for the operator!
Please keep in a safe place!
(Documents are to be presented during inspections
of the tank system.)
1. Approval "OPERATOR EXCERPT"
This is a translation of the German original document
and has not been reviewed by the German Institute for
Structural Engineering.
DEUTSCHES INSTITUT FÜR BAUTECHNIK (GERMAN
page
9 - 13
INSTITUTE FOR STRUCTURAL ENGINEERING)
page
14
page
14
10829 Berlin, 22. August 2005
Kolonnenstraße 30 L
Tel: 030 78730-338
Fax: 030 78730-320
Company reg. no.: : 11111-1.40.12-72/03
Approval number:
Applicant:
Object of approval:
Valid until:
The above named object of approval is hereby granted General
Construction Inspection Approval. This General Construction Inspection
Approval consists of seven pages and four annexes with 16 pages.
An institution of public law
General Construction Inspection Approval
Z-40.12-227
Chemowerk GmbH
In den Backenländern
71384 Weinstadt
GRP containment devices.
31. May 2009
GB
9

Publicidad

Tabla de contenido
loading

Tabla de contenido