Fields Of Use - CEMO Z-40.12-227 Manual Del Usuario

Colector de plástico reforzado con fibra de vidrio
Ocultar thumbs Ver también para Z-40.12-227:
Tabla de contenido

Publicidad

GB
2. Transport, installation and
operating instructions
Dear customer,
The GRP collecting trough is a quality product that has
been conceived for practical use down to the last detail
and meets all official requirements for a problem-free use.
Details can be found in the following operating instruc-
tions. Thank you for trusting our product.
Your CHEMOWERK
1.
General information
1.1 Attention should be paid to the following documents
– Approval Z-40.12-227, for GRP collecting trough
(operator extract)
– Regulations of the water, industrial and building
laws, hazardous substances law where applicable
– Inspection declaration (rear cover)

1.2 Fields of use

The rectangular, open collecting troughs of glass fibre
reinforced plastic GF-UP can be used as a part of storage
systems with mobile containers.
They are designed for the storage of:
– used and new engine and gear oils
– diesel fuel, fuel oil EL
– various acids, alkaline solutions, saline solutions
and chemicals according to the resistance list in
the approval.
2.
Transport
Pay special attention to the following to avoid damages
and maintain the warranty claims:
– do not drop or throw the collecting trough
– do not place on edges or sharp objects
3.
Installation conditions
The installation conditions for the respective media can
be found in the pertinent water, industrial and building law
regulations.
The GRP collecting troughs should be installed on a firm,
level base.
4.
Maintenance
GRP collecting troughs require no special maintenance.
The collecting trough should be checked regularly by the
operator according to its approval.
14
3. Inspection declaration
Inspection declaration
for GRP collecting trough
of glass fibre reinforced plastic as a storage system for
mobile containers.
Article No.:
211.X
Approval number:
Z-40.12-227
We confirm that the GRP collecting trough complies
with the provisions of the general construction inspec-
tion approval. The construction and leak tests have
been performed.
Quality Assurance

Publicidad

Tabla de contenido
loading

Tabla de contenido