Installing The Door Panel - GE UCC15NP Manual Del Propietario E Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLING THE DOOR PANEL

The ice machine is supplied without a conventional
door covering, allowing the attachment of a door panel
or a custom panel.
NOTE:
be done BEFORE attaching the door panel.
Door Panel
Finished door panels with handles are available from
GE Appliances for attachment to the ice machine. See
Accessories on page 27.
A custom panel of wood or other material not
exceeding 15 lbs can be used and must follow these
guidelines:
For Custom Panel:
1. Place product in opening and level by adjusting
leveling legs as needed.
2. Measure how much if any the custom panel needs
to extend above the inner door panel to match
any panels on either side. Note the clearance
between the top of the panel and the countertop
3. Remove the door by removing the 4 hinge screws.
4. Cut panel to the specified width and desired
height.
Cabinet
opening
49-1000640 Rev. 0
Installation Instructions
clearance
Toekick
height
5. Lay panel on a surface and align the door on top
of the panel so that it located as measured in step
2. The sides of the panel should align with the
sides of the door.
6. Mark locations of at least the 4 holes in the top
and bottom. Remove the door and measure and
mark any remaining holes per the diagram.
through the panel.
TYP (10)
Centerline
15

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ucc15nprii

Tabla de contenido