Device Operation And Control - Dantherm Master DHP 20 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
Report any transport damage or incom-
plete delivery to your dealer.
Adjusting handle
1. Release the locking mechanism of the
handle, and pull out the handle to the de-
sired length.
Connecting drain hose
For operation, the supplied drain hose must
always be connected to the device.
ATTENTION! Poor device performance
Ü Do not kink the drain hose.
Ü Do not place any objects on the hose.
Procedure
1. Secure the quick-release coupling of the
drain hose to the connector at the rear of
the device.
2. Lead the drain hose away from the
device and place the free end in an on-
site drain opening or a sufficiently large
collecting vessel (maximum level differ-
ence: 6 m).
Stacking devices
For operation or storage, it is permissible to
combine maximum two devices in a stack.
1. Do to this, loosen and fully retract the
handle of the device at the bottom.
2. Place the second device on the first one.
Ensure that the bases of the second
device slot into the recesses in the first
one.
Connecting device to electric power
mains
1. Ensure that the voltage of the power
mains corresponds to that specified in
Technical data.
2. Ensure that the mains socket is suffi-
ciently protected (see
data).
8
3. The power socket to which the device is
connected must be equipped with a RC
circuit breaker. This is particularly import-
ant for operation in humid rooms and on
construction sites.
4. Make sure that the mains socket is
earthed and matches the power plug of
the device.
5. Connect the power plug into the mains
socket.

8 Device operation and control

Prior to switching on
1. Make sure that the device is not standing
on a wet ground and ensure that it is in
an upright and stable position.
2. Make sure that the condensate can drain
off properly.
3. If necessary, record the readings of the
operating hours counter.
NOTICE! Before starting the device for
the first time, after transport and after
prolonged storage, leave the device in its
final position for approx. 15 minutes be-
fore switching it on.
Setting target humidity, switching on
device and running it in continuous
mode
1. Set the hygrostat to the desired target
humidity.
2. Set the device switch to position [I].
in Technical
ð The green indicator is lit, indicating
that the compressor is running.
ð The device starts in continuous
mode and runs until the set target
humidity is reached or the auto-
matic defrost function is triggered
(yellow indicator lit).
In continuous mode, condensate is
automatically pumped off.

Publicidad

Tabla de contenido
loading

Tabla de contenido