Agri-Fab 45-04733 Manual Del Usuario página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

USiNG tHE SMartliNk PlatforM
attaCHiNG toolS - CENtEr BraCE
Depending on which tool is used, the center brace
may need to be moved to either the center or top of the
Smartlink Platform.
1.
For roller and dethatcher tools, the center
brace should be attached to the top of the
Smartlink Platform as shown in figure 9. tighten.
rollEr aND DEtHatCHEr
2. For spike and plug aerator tools, the center
brace should be attached to the middle of the
Smartlink Platform as shown in figure 10. Do not
tighten yet.
SPikE aND PlUG aErator
PRE-ASSEMBLED BOLT
fiGUrE 9
PRE-ASSEMBLED BOLT
fiGUrE 10
attaCHiNG toolS - loaDiNG toolS
Different tools should be attached in the ways outlined
below to lower risk of injury. Always exercise caution when
loading a tool into the platform.
SPikEr/PlUGGEr
1.
Slide the bushings on each end of the tool into the
axle retainers one end at a time. Make sure the axle
retainers snap into the lock position. See figure 11.
2. Proceed to LOCKING TOOLS section on page 8.
rollEr
1.
Fill roller with water then insert and lock roller plug.
2. Position platform over roller.
3. Unlock lift handle and lower platform until axle
retainers lock onto bushings.
4. Proceed to LOCKING TOOLS section on page 8.
7
fiGUrE 11
fiGUrE 12

Publicidad

Tabla de contenido
loading

Tabla de contenido