7.2 Maintenance plan
Figure 7.1
Overview of maintenance points
Maintenance point
1
2
3
4
3
5
7
2859970000/00/02.2022
Interval/maintenance activity
Daily
Empty the waste tray
Weekly
Clean the outside of the machine
Clean the interior
Clean the wire holding tongs
Check and clean the stripping blade
Monthly
Lubricate the wire holding tongs
Lubricate the crimp cylinder
Lubricate the stripping blade activation
Semi-annually
Lubricate the drive shaft
Cleaning and maintaining the machine
2
6
3
4
5
1
Chapter
7.3
7.4
7.5
7.6
7.7
7.6
7.8
7.10
45