Final Checks; User Instruction - Erreka CICLON CLS210 Manual Del Instalador

Accionador electromecánico para puertas batientes
Ocultar thumbs Ver también para CICLON CLS210:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5

FINAL CHECKS

Connections and checks
F
< 400N in spaces between 50mm and 500mm
d
F
< 1400N in spaces> 500mm
d

User instruction

L
I
1 Install an eletrolock to lock the gate in closing
position. This is necessary for model CLS210 and for
model CLS210F if the length of the leaf is over 1.8m.
See the electrolock instructions.
2 Carry out the installation and the connections for all
the elements of the facility, in line with the control
panel instructions.
3 Check that the mechanism is correctly regulated.
The torque regulator of the control panel must
be adjusted in a manner which respects the
values indicated in standard EN 12453:2000, as
shown
in
the
measurements must be made in line with the
method described in standard EN 12445:2000.
4 Check the operation of all the installation elements,
especially the protection systems and the manual
operation unlocking system.
1 Instruct the user with regards to the use and
maintenance of the facility and provide him/her with
the use manual.
2 Point to the gate, showing that it opens
automatically, and indicating how to operate it
manually. Where appropriate, indicate that
operation is using the remote control.
CICLÓN Electromechanical Operator
INSTALLATION
attached
chart.
The
47

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ciclon cls210f

Tabla de contenido