Kohler Veil K-5402-0 Instrucciones De Instalación página 8

Ocultar thumbs Ver también para Veil K-5402-0:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Install the Bowl
Plastic
Steel
CAUTION: Risk of personal injury. This product is heavy. Lift the toilet with two people, using proper lifting
technique.
NOTE: When mounting the bowl, be sure any necessary water and electrical lines are accessible. Run the lines through
the vitreous on the right side of the bowl so that they can be connected in the next steps.
NOTE: Verify that the gaskets are well lubricated with plumbers grease. Reapply plumbers grease if necessary.
Verify that the gasket on the inside of the inlet elbow has correctly engaged with the inlet pipe.
Verify that the gasket on the inside of the outlet elbow has correctly engaged with the outlet pipe.
Carefully lift the bowl and align the threaded rods and pipes with the corresponding holes.
Slide the bowl onto the threaded rods, inlet pipe, and outlet pipe.
Verify that the bowl fully engages the gaskets on the inlet and outlet pipes.
Slide the bowl back until flush with the wall.
Install the plastic washers, steel washers, and nuts over the threaded rods.
Tighten the nuts with a socket wrench and 3/4" socket.
1247364-2-C
8
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido